--- SEARCH ---
WEATHER
CHINA
INTERNATIONAL
BUSINESS
CULTURE
GOVERNMENT
SCI-TECH
ENVIRONMENT
SPORTS
LIFE
PEOPLE
TRAVEL
WEEKLY REVIEW
Film in China
War on Poverty
Learning Chinese
Learn to Cook Chinese Dishes
Exchange Rates
Hotel Service
China Calendar
Dialing and
Postal Codes


Hot Links
China Development Gateway
Chinese Embassies

The Ministry of Foreign Affairs
Permanent Mission of the People's Republic of China to the UN
Permanent Mission of the People's Republic of China to the United Nations Office at Geneva and other International Organizations in Switzerland
Foreign Affairs College
Iran, Russia Sign Key Nuclear Fuel Agreement

Iran and Russia on Sunday signed a key nuclear fuel agreement, removing the last obstacle to the launch of Iran's Bushehr nuclear power plant which is expected to be operational in 2006.

The plant, located in the southern province of Bushehr, is Iran's first nuclear power plant being built with Russia's aid. In order to prevent Iran from making nuclear weapons with the spent fuel, Moscow conditioned the delivery of nuclear fuel to the Bushehr plant on Iran's signing of a deal which obliges it to return spent fuel to Russia.

Tehran finally agreed to sign the deal after numerous disputes.

Alexander Rumyantsev, chief of Russia's nuclear energy agency, arrived Friday in Tehran to sign the agreement on Saturday after talks with his Iranian counterpart Gholamreza Aghazadeh.

However, the prolonged discussion postponed the signing till Sunday.

The two nuclear chiefs inspected the ongoing construction of the plant where they signed the agreement after holding the second round of talks.

As to the talks, Mohammad Saeidi, a deputy to Aghazadeh, said that Rumyantsev's proposed timetable of the operation was turned down but the two sides were determined to reach a final agreement on the time of its inauguration.

Saeidi referred to Russia's proposal that the opening of the plant be delayed until June 2006.

Aghazadeh told reporters after the signing ceremony that the Bushehr plant would become on stream indeed in 2006, but the exact date was to be determined.

"Our Russian partner is determined to fully install the equipment of the first phase of the power plant in 10 months. Meanwhile, we are looking forward to implementation of the primary phase within the scheduled time with great hope," he added.

Aghazadeh did not reveal the time of dispatch of the first fuel consignment as it was confidential.

For his part, Rumyantsev said that a number of Russian installation specialists are scheduled to arrive at the Bushehr Plant soon.

"We are coming up with arrangements to make up for the delay in implementation of the Bushehr Nuclear Power Plant by sending the reactor's equipment," he said.

"We will do our best to implement the Bushehr Power Plant in the best possible way," Rumyantsev concluded.

Meanwhile, Russian foreign ministry spokesman said that the signing of the agreement did not mean that Russia was going to deliver nuclear fuel to Iran immediately.

"The nuclear fuel would be delivered only after the Bushehr station had become ready for fueling," the spokesman said.

(Xinhua News Agency February 28, 2005)

Iran to Continue Enrichment Program
Rice: US Sets No Deadline for Iran to Act
Iran Raps European Delay, Pursues Speedup in Nuke Talks
Iran Condemns Bush Speech on Terrorism
Iran Seeks Accelerated Talks with Europe
Iran Foreign Minister Warns of Strong Defense
Print This Page
|
Email This Page
About Us SiteMap Feedback
Copyright © China Internet Information Center. All Rights Reserved
E-mail: webmaster@china.org.cn Tel: 86-10-68326688